Abraham, D M (1990) A state-based framework using indicators for construction monitoring and evaluation, Unpublished PhD Thesis, , University of Maryland, College Park.

Ahrari, A (2012) A decision support system for dynamic integrated project scheduling and equipment operation planning, Unpublished PhD Thesis, , University of Maryland, College Park.

Akar, G (2009) Analysis of activity choice: The role of activity attributes and individual schedules, Unpublished PhD Thesis, , University of Maryland, College Park.

Al-Fadhala, M M (2002) Uncertainty-based condition assessment of existing concrete structures, Unpublished PhD Thesis, , University of Maryland, College Park.

Al-Wazeer, A A-R (2007) Risk-based bridge maintenance strategies, Unpublished PhD Thesis, , University of Maryland, College Park.

Avetisyan, H G (2013) Sustainable infrastructure modeling and policy analyses: Construction, energy and transportation industries, Unpublished PhD Thesis, , University of Maryland, College Park.

Bai, L (2013) RFID sensor-driven structural condition monitoring in integrated building information modeling environment, Unpublished PhD Thesis, , University of Maryland, College Park.

Bender, W J (2000) A risk-based cost control methodology for constructing complex structures with the mobile offshore base as a case study, Unpublished PhD Thesis, , University of Maryland, College Park.

Chelson, D E (2010) The effects of building information modeling on construction site productivity, Unpublished PhD Thesis, , University of Maryland, College Park.

Chen, C-H (2003) Integrated management of highway maintenance and traffic, Unpublished PhD Thesis, , University of Maryland, College Park.

Cheung, M (2017) The antecedents of safety leadership, Unpublished PhD Thesis, , University of Maryland, College Park.

Chung, B (2007) An analysis of success and failure factors for ERP systems in engineering and construction firms, Unpublished PhD Thesis, , University of Maryland, College Park.

Ding, Q (2018) Using social media to evaluate public acceptance of infrastructure projects, Unpublished PhD Thesis, , University of Maryland, College Park.

Eldukair, Z A R (1988) Safety assessment and optimization of construction operations based on fuzzy sets, Unpublished PhD Thesis, , University of Maryland, College Park.

Erfani, A (2023) Data-driven risk modeling for infrastructure projects using artificial intelligence techniques, Unpublished PhD Thesis, , University of Maryland, College Park.

Hao, J X (2007) Infrastructure investment and economic development, Unpublished PhD Thesis, , University of Maryland, College Park.

Hickey, P J (2023) A study of gender diversity in u.S. Architecture, engineering, and construction (AEC) industry leadership, Unpublished PhD Thesis, , University of Maryland, College Park.

Hsu, S-C (2013) A complexity-based approach to intra-organizational team selection, Unpublished PhD Thesis, , University of Maryland, College Park.

Hu, M (2022) Influence of project design team characteristics on construction cost of sustainable buildings, Unpublished PhD Thesis, , University of Maryland, College Park.

Ingraham, A T (2001) Bidder-auctioneer cheating in sealed-bid auctions, Unpublished PhD Thesis, , University of Maryland, College Park.

Jang, W S (2007) Embedded system for construction material tracking using combination of radio frequency and ultrasound signal, Unpublished PhD Thesis, , University of Maryland, College Park.

Karimi, S (2021) A systematic methodology for evaluating and balancing acceptance risks with pay factors for highway construction materials, Unpublished PhD Thesis, , University of Maryland, College Park.

Lessani, A (2016) Decision analysis in construction claims, Unpublished PhD Thesis, , University of Maryland, College Park.

Lu, R (2010) Impacts of local item dependence of testlet items with the multistage tests for pass-fail decisions, Unpublished PhD Thesis, , University of Maryland, College Park.

McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling, Unpublished PhD Thesis, , University of Maryland, College Park.

Mohieldin, Y A (1989) Analysis of construction processes with nonstationary work task durations, Unpublished PhD Thesis, , University of Maryland, College Park.

  • Type: Thesis
  • Keywords: construction operations; earthmoving; excavation; integrated system; integration; variations; simulation; test cases; duration
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/303794466
  • Abstract:
    A construction process is regularly subjected to changes in conditions. These changes may cause individual work task durations to vary over time. In such a case, the process is defined as nonstationary. A significant factor causing variations in work task durations is the change in locations of work areas. Such changes are apparent in linear operations like earthmoving where loading and dumping are performed in different cut and fill areas respectively, and concrete pouring in high-rise buildings as the pouring operation advances to higher floors. Simulation provides an excellent tool for the analysis of construction operations with their dynamic nature. Very little effort has been directed towards simulation analysis of nonstationary operations. The reason is mainly the lack of an efficient tool which allows for the incorporation of nonstationary durations in the simulation model. In this dissertation, a new computer system for the analysis of nonstationary construction processes is introduced. It integrates a simulation system, STEPS, which has been developed recently at the University of Maryland, with a process planning module. The integration allows that a work sequence can be established according to a chosen work plan, which feeds automatically into the simulator. Earthmoving is used as a test-bed for this research. The integrated system allows for the designation of cut and fill areas, with their locations and quantities, and for specifying the sequence of moving earth among various areas. Condition factors may be assigned to cut areas to reflect the effect of different soil conditions on excavation time. The effect of the change of hauling distances, which results in nonstationary durations for traveling work tasks, was studied. It was found that process duration and resource idleness when considering the impact of nonstationarity were significantly different from those obtained when that impact was ignored. An approach to the allocation of resources, which varies the number of resources in relation to the hauling distance, is presented. For different test cases, the use of this approach always resulted in less duration and cost, and higher resource efficiency than results obtained using a fixed number of resources.

Moore, W B (1989) Modeling the impact of large construction projects on surrounding communities, Unpublished PhD Thesis, , University of Maryland, College Park.

Neely, L E (2017) Project scheduling disputes: Expert characterization and estimate aggregation, Unpublished PhD Thesis, , University of Maryland, College Park.

Negahban, S (2008) Utilization of enterprise resource planning tools by small to medium size construction organizations: A decision-making model, Unpublished PhD Thesis, , University of Maryland, College Park.

Nyakaana Blair, A M A (1999) Risk analysis of cost and schedule of complex engineering systems, Unpublished PhD Thesis, , University of Maryland, College Park.

Ordonez Arizaga, J F (2007) A methodology for project risk analysis using Bayesian belief networks within a Monte Carlo simulation environment, Unpublished PhD Thesis, , University of Maryland, College Park.

Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study, Unpublished PhD Thesis, , University of Maryland, College Park.

Parvan, K (2012) Estimating the impact of building information modeling (BIM) utilization on building project performance, Unpublished PhD Thesis, , University of Maryland, College Park.

Quadri, H A (2019) Value engineering decisioneering: A risk management tool in the project management office- case study of electricity distribution companies in Nigeria, Unpublished PhD Thesis, , University of Maryland, College Park.

Salgado, C A (2005) Construction project organizational structuring, Unpublished PhD Thesis, , University of Maryland, College Park.

Shafahi, A (2016) Mathematical model and framework for multi-phase project optimization, Unpublished PhD Thesis, , University of Maryland, College Park.

Sharma, D K (2012) Design of availabilty payment mechanism for public private partnerships, Unpublished PhD Thesis, , University of Maryland, College Park.

Sundararajan, S K (2004) Project performance-based optimal capital structure for privately financed infrastructure projects, Unpublished PhD Thesis, , University of Maryland, College Park.

Tatari, M O (2009) Empirical analysis of construction enterprise information systems: Assessing the critical factors and benefits, Unpublished PhD Thesis, , University of Maryland, College Park.

Vecino, G A (2016) The feasibility of using web-based technology for the management of dredging projects, Unpublished PhD Thesis, , University of Maryland, College Park.

Yang, N (2010) Optimization of highway work zone decisions considering short-term and long-term impacts, Unpublished PhD Thesis, , University of Maryland, College Park.

Zeng, Y (2010) Risk management for enterprise resource planning system implementations in project-based firms, Unpublished PhD Thesis, , University of Maryland, College Park.